Strength is half the story with customizable engineered lagging for pipeline projects, including boring, cased crossings, and extreme impact protection. PipeDefender® is the environmentally inert replacement for wood lagging and concrete coatings. PipeDefender® is proven to work with cathodic protection systems and can be installed at 1 foot per minute with just two workers. See how it works below or contact us for more information.
Projects
Built For Extreme Protection
Made from high impact strength polyethylene, PipeDefender® has been performance tested to ASTM standards. The unique peak and valley design is engineered to not only disperse force but also absorb deformation. PipeDefender®, rated to withstand boulders of 60 lb when dropped from 10 feet, is the next generation replacement for wood lagging and thin concrete coating.
As Easy As It’s Strong
Strength is only half the story. PipeDefender® at only 23 lb per panel, can be easily handled and quickly installed using our patented QuickZip™ fasteners. Our unique, interlocking system can accommodate all pipelines sizes 16″ and larger. PipeDefender® installation is so simple, two workers can install up to 1 foot-per-minute, maximizing productivity & efficiency.
Smart & Versatile
Our patented multi-channel drainage design allows for ground water to easily flow in and out of PipeDefender®. The free-flowing water ensures resistivity levels remain within typical variations found in soils, in addition to preventing water from pooling against the pipe surface. What’s more, PipeDefender® will reduce bedding costs by eliminating the need for imported or screened backfill.