Robstown to Ingleside

  • Robstown, TX, USA / 2019
  • Epic Midstream
    • Products Used:

In early 2019, Epic Midstream began work on a portion of pipeline that would run from Robstown, TX to Ingleside, TX. As part of a larger project, this pipeline would contribute to the distribution of 400 thousand barrels of oil per day (MBbl/d) to multiple terminals and refiners. This portion of the project spanned 6 miles, using 20″ O.D. pipe. The contractors on this project chose to purchase 1,750 QF20 PipeSak® Pipeline Weights from PipeSak® Inc., to be used for buoyancy control.

The PipeSak® Pipeline Weights used for this project contained 5,000lbs of pea gravel, using the PipeSak® patented multi-chamber design to promote the integrity of the PipeSak® Pipeline Weight. PipeSak® Pipeline Weights spread the weight of the ballast using a multi-compartment design that is safer and longer lasting than the one or two compartment designs used by other fabric weight companies.

PipeSak® Pipeline Weights are the only geotextile pipeline weight with a multi-compartment design that is engineered to evenly distribute the weight. This design also speeds up installation, and ensures integrity is maintained even in the event one compartment becomes damaged.

#
PipeSak® Weights Used
mi
Total Distance

Get a Product Quote

For a confidential quote on your pipeline needs, please complete the form below.

Get a Filling or Training Quote

For a confidential quote on your pipeline needs, please complete the form below.

  • General Info

  • Project Info

Get an Information Kit

For a confidential quote on your pipeline needs, please complete the form below.

  • General Info

  • Project Info

Get a Spacing Estimate

For a confidential quote on your pipeline needs, please complete the form below.

  • General Info

  • Project Info

We use cookies to improve your experience.