Green Country Power

  • Jenks, OK, USA / 2021
  • ONEOK
    • Products Used:

The Green Country Power Project was a 16” pipe that runs through Jenks, Oklahoma. Due to this project being in a flood plain, 100 yards of buoyancy control was needed. To keep the project on schedule, a quick and easy installation was needed. After getting a spacing estimate from PipeSak’s engineering team, it was determined that 42 PipeSak saddlebag weights would be needed to prevent the pipe from floating when flooding occurred. The PipeSaks were filled on the ROW and the low-profile design meant that no extra trench depth was needed.

#
PipeSak Geotextile Pipeline Weights
Yards
Total Distance

Get a Product Quote

For a confidential quote on your pipeline needs, please complete the form below.

Get a Filling or Training Quote

For a confidential quote on your pipeline needs, please complete the form below.

  • General Info

  • Project Info

Get an Information Kit

For a confidential quote on your pipeline needs, please complete the form below.

  • General Info

  • Project Info

Get a Spacing Estimate

For a confidential quote on your pipeline needs, please complete the form below.

  • General Info

  • Project Info

We use cookies to improve your experience.