The Blue Line Replacement project was a 10”, 6.6 miles through Eureka, Missouri to deliver fuel products to Missouri and Illinois. The pipeline had multiple crossings along the right-of-way, including residential areas, under roads and through water. This pipeline needed a superior rockshield to reduce construction impact. To help protect the pipe from possible impact, PipeSak supplied 605 PipeJacket rolls to prevent damage to the pipes’ coating. With PipeJacket’s ultimate impact and abrasion resistance, paired with the quick and easy delivery, the clients’ pipeline was fully protected and ready to be lowered into the trench without any delays.